Completed Projects
D+Z Constructions offers a total commitment to delivering quality projects on time and on budget within an accident/incident free, and zero harm environment built upon sustainable, dynamic company policies, procedures and systems.
Other Projects
Value: $700,000
Client: CCA
Scope of Works:
Construction of a concrete 25m swim/lap pool with an attached learn to swim pool and balance tank. DZC's scope of works comprised of the supply and installation of formwork, reinforcement and concrete including the placement of all cast-in items to the pool and associated works. These works comprise of the fixing of including the specialised welding of the water-stop to c-joints also the concrete and formwork requirements were constructed to very tight tolerance and specification.
Value: $2.05 Million
Client: Guidera O'Connor
Scope of Works:
DZC’s contracted works consisted of bulk and detailed earthworks, including supply of concrete, formwork, reinforcement, plant and machinery for the construction of footings, ground slab, suspended slab also construction of the paved roads to the project. These works were conducted within the operating treatment plant with a very high regard to safety and workmanship.
Value: $2 million
Client: WBHO
Scope of Works:
Situated 300km south of Kununurra on Great Northern Hwy, culvert construction works consisted of bulk and detailed earth works, the supply & placement of reinforcement, formwork installation and concrete installation. It was imperative to complete works on time to avoid the wet season.
Value: $2.8 million
Client: Guidera O'Connor
Scope of Works:
The works consisted of detailed earth works, the supply & placement of concrete, supply and fix of reinforcement and the supply and installation of formwork. The upgrade comprised of two water retaining structures and associated civil works of which included building works.
Value: $7.12 Million
Client: CPB Contractors
Scope of Works:
Construction of 6no. complete bridge structures, a PSP footbridge structure, an underpass structure and 300no. in-situ headwalls and wing-walls to culverts. Contract scope includes detailed earthworks, concrete placement and finishing, supply and installation of formwork (including design), reinforcement fixing, installation of MSE precast walls and structural backfill to the MSE earth block.
Value: $1.93 Million
Client: RCR Water
Scope of Works:
The works consisted of detailed earth works, the supply and placement of concrete, supply and fix of reinforcement and the supply and installation of formwork. These works were conducted in a live operating water treatment plant, to which required careful planning to avoid any disruptions to the plant operations. DZC's contract works comprised of the placement of large concrete pipes including the encasement of said pipes, construction of new drainage channels for diversion of treated sewage, the demolition and removal of the old drainage channels. Remediation works to existing settlement ponds including the circular upper draining channels and installation according to the improved design of the 8 tanks in total, which were isolated and constructed in 4 blocks of two tanks.
Value: $1.3 Million
Client: CPB Contractors
Scope of Works:
Construction of a 6-lane traffic bridge over an existing railway line, along with a pedestrian underpass and extensive noise and retaining walls. Detailed scope included the supply and installation of formwork, fixing of reinforcement, placement of concrete to the bridge and underpass structures whilst also completing the installation of underpass precast trapezoids, MSE and noise wall panels.
Value: $1.6 Million
Client: Lend Lease Pty Ltd
Scope of Works:
Construction of the East and West in-situ retaining walls along with widening of the bridge on Victoria Park Drive, Burswood. The works consisted of large area of one-sided formwork and concreting to the underside of the bridge piles.
Value: $6.5 Million
Client: Georgiou Building
Scope of Works:
FRC Package of the Locomotive Facility comprising of locomotive maintenance shed, warehouse, trip services depot and apron slabs. 4.5km of Roadworks and Bulk Earthworks for the Locomotive Facility including two coat seal of roads, signage, line marking of roads and construction of concrete culverts and drainage.
Value: $5.9 Million
Client: Georgiou Building
Scope of Works:
DZC FRC Package to the Locomotive Facility comprising of locomotive maintenance shed, retaining wall, storage slabs, wagon maintenance shed, warehouse, apron slabs, and concrete panels. DZC FRC Package to Sims Street Concrete Bridge comprising of 11.0m high abutments, approach slabs and deck. DZC supplied to both sites all formwork materials, labour to construct the works including reo fixing, placing, finishing of concrete works and plant, craneage and machinery.
Value: $8.5 Million
Client: Diploma Construction
Scope of Works:
Construction of all concrete works for a 16 storey building structure, comprising raft foundation, ground slabs, columns, beams, suspended slabs and stair/elevator shafts including detailed earthworks to the forward Works Package.
Value: $40.8 Million
Client: Griffin Coal Mining Co.
Scope of Works:
Design, supply, fabrication, installation and commissioning of the Coal Delivery System CV 01 and CV 02, including all excavations, concrete works, structural steelwork and mechanical conveyors overland from Ewington Mine Site to the Bluewaters Power Station. To do bulk and detailed earthworks, construction of roads, approx. 7kms including sealed paving of roads to the Bluewaters Power Station Plant and to the Haul road from the plant to Ewington Mine Site according to Main Roads Specifications and including all installation of all above and below ground services.
Other projects are available on request via: dzc@dzconstructions.com.au