top of page
Kondinin Water Supply Improvements
Kondinin Water Supply Improvements
August 2017 – December 2017
$1.67 Million
Construction of a 2.5Ml in-situ and precast concrete water tank 28.4mtr in diameter and 6.2mtr in height. The design consisted of an in-situ base slab and walls, precast concrete columns, beams and planks with an in-situ topping slab acting as the roof. DZC completed detailed earthworks, the supply and install of formwork, supply and install of precast elements, supply and fix of reinforcement, supply and install of cast-in pipework/hatches and the supply and placement of concrete
RCR Water
bottom of page